Gunawan, A., Nainggolan, O. and Toyib (2026) “Analisis Pengoperasian Kerja Paralel Tiga Generator 3 Fase Kapasitas 3×1000 kVA Pada PT. Cahaya Fajar Kaltim”, MikroGrid, 1(1). doi: 10.46964/mikrogrid.v1i1.94.