Implementation Of The Critical Path Method (CPM) For The Schedule Of A Type 63 Residential House Construction Project In Samarinda
Keywords:
Critical Path Method (CPM), Project Delay, Microsoft Project, Type 63 Residential House, Optimal Duration.Abstract
Construction projects frequently experience schedule deviations caused by various factors, including cash flow constraints, delays in material delivery, adverse weather conditions, and subjective activity duration estimates. Such delays often reduce project efficiency and increase labour costs, particularly in small-to-medium-scale residential construction projects where daily wage expenses are highly sensitive to project completion time. Therefore, an effective scheduling technique is required to identify critical activities and optimise project duration. This study aims to evaluate the draft scheduling plan for the construction of a Type 63 residential house (7 × 9 metres) located in Samarinda by applying the Critical Path Method (CPM). The research adopted a quantitative descriptive approach using project planning data obtained from construction documents and interviews with the project manager. Activity durations, predecessor relationships, and work sequences were organised into a hierarchical Work Breakdown Structure (WBS) and analysed using Microsoft Project to develop the project network, perform forward pass and backward pass calculations, determine total float values, and identify the critical path. The analysis revealed a sequence of critical activities with a total float value of zero, indicating that any delay in these activities would directly affect the overall project completion time. The findings demonstrate that the construction project can be completed within an optimal duration of 90 calendar days. The integration of CPM with Microsoft Project effectively improves scheduling accuracy, minimises worker idle time, enhances operational management, and reduces the potential risk of labour cost overruns, thereby supporting more efficient construction project planning and control.
References
Abdul, H., Puspita, I. A., & Bay, A. F. (2020). Combination of Program Evaluation and Review Technique ( PERT ) and Critical Path Method ( CPM ) for Project Schedule Development. 3, 68–75.
Abdul Nabi, M., & El-adaway, I. H. (2021). Understanding the Key Risks Affecting Cost and Schedule Performance of Modular Construction Projects. Journal of Management in Engineering, 37(4), 04021023. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000917
Alhady, A., Abd Alrahman, K., & Mahfouz, S. (2025). Time-cost quality risk trade-off for infrastructure projects in Egypt. HBRC Journal, 21(1), 234–246. https://doi.org/10.1080/16874048.2025.2473774
Alicia, R., Sigit, P., & Al-muqaffa, F. W. (2023). Evaluasi Penjadwalan Waktu Pada Proyek Pembangunan Rumah dengan Metode CPM ( Studi Kasus: Pembangunan Rumah Tinggal di Perumnas Kabupaten Karawang ). 04(02), 148–157.
Annisa Nur Khofifah, E. V. (2025). Jurnal manajemen. 15(1), 105–117.
Fijra, R., Rahmalia Putri, A., Mawasandi, F., & Harisnanda, F. (2025). IMPLEMENTASI CRITICAL PATH METHOD (CPM) PADA PROYEK PERUMAHAN XYZ UNTUK MENINGKATKAN EFISIENSI MANAJEMEN PROYEK. Journal Industrial Engineering and Management (JUST-ME), 6(01), 86–93. https://doi.org/10.47398/justme.v6i01.105
Gómez-Cabrera, A., Gutierrez-Bucheli, L., & Muñoz, S. (2024). Causes of time and cost overruns in construction projects: A scoping review. International Journal of Construction Management, 24(10), 1107–1125. https://doi.org/10.1080/15623599.2023.2252288
Hoon, S., & Sang, Y. (2026). Quantitative analysis of schedule impact due to design changes in finishing construction work: ( A case study of office buildings ). KSCE Journal of Civil Engineering, 30(2), 100362. https://doi.org/10.1016/j.kscej.2025.100362
JAMES E. KELLEY, JR. f A. M. R. Walker. (1959). Critical-Path Planning and Scheduling. 160–173.
Kerzner, H. (2017). Project Manajement.
Lestari, F., Oktarina, D., & Fadilasari, D. (2022). Evaluasi Faktor-Faktor Penyebab Keterlambatan ( Studi Kasus pada Pekerjaan Pembangunan Gedung Lanjutan SMPN 39 Bandar Lampung ). 2(1), 25–38.
Mulia, T. N., & Candra, R. (2023). Analisis Penjadwalan Proyek Menggunakan Critical Path Method ( CPM ) Studi Kasus pada Pembangunan Gapura Taman Hutan Lindung Kota Langsa. 7, 82–90.
Ningsih, A., Surahman, S., Ariani Aisyiah, S., Syahara, A., & Bayhaqi, A. (2025). Implementation of Critical Path Method (CPM) in Project Management of Type 45 House Construction in Samarinda. Journal of Business Management and Economic Development, 3(02), 758–770. https://doi.org/10.59653/jbmed.v3i02.1657
Pekerjaan, M., Dan, U., Rakyat, P., & Indonesia, R. (2022). Menteri pekerjaan umum dan perumahan rakyat republik indonesia. 1–18.
Perdana, M. A., & Sari, R. P. (2022). Optimalisasi Waktu Pelaksanaan Proyek Konstruksi Rumah Tinggal Menggunakan Metode CPM (Critical Path Method) dan PERT (Program Evaluation and Review Technique). Jurnal Media Teknik Dan Sistem Industri, 6(2), 116. https://doi.org/10.35194/jmtsi.v6i2.1944
Perdana, M. S. A., & Sari, R. P. (2022). Optimalisasi Waktu Pelaksanaan Proyek Konstruksi Rumah Tinggal Menggunakan Metode CPM ( Critical Path Method ) dan PERT ( Program Evaluation and Review Technique ) Optimizing the Implementation Time of Residential Construction Projects Using the CPM ( Critical Path Method ) and PERT ( Program Evaluation and Review Technique ). 6(2), 116–123. https://doi.org/10.35194/jmtsi.v6i2.1944
Qi, K., Owusu, E. K., Siu, M. F., & Chan, P. A. (2024). A systematic review of construction labor productivity studies: Clustering and analysis through hierarchical latent dirichlet allocation. Ain Shams Engineering Journal, 15(9), 102896. https://doi.org/10.1016/j.asej.2024.102896
Rafiqa Fijra, Anindita Rahmalia Putri, Fahrurrozi Mawasandi, F. Harisnanda. (2025). Implementasi Critical Path Method ( Cpm ) Pada Proyek Perumahan Xyz Untuk Meningkatkan Efisiensi Manajemen Proyek. 06(01), 86–93.
Sa, N., & Rijanto, T. (2021). Evaluasi Proyek Pembangunan Gedung Stroke Center ( Paviliun Flamboyan ) Menggunakan Metode Critical Path Method ( CPM ) Dan Crashing Evaluation of building construction Stroke Center ( Paviliun Flamboyan ) using the Critical Path Method ( CPM ) And Crashing Method. 3(2).
Saputra, I. H., Erina, Y., & Rodhi, N. N. (2024). Analisis Pengendalian Waktu dan Biaya Proyek Konstruksi dengan Metode CPM ( Critical Path Method ). 4, 7797–7807.
Sinurat, F., & Misdalena, F. (2024). Analisis Manajemen Proyek Dengan Metode Critical Path Method ( CPM ) Pada Proyek Pembangunan Gedung Chandra Tanjung Karang. 2–11. https://doi.org/10.33364/konstruksi/v.22-2.2131
Surahman, S., Kusumah, A., Tiara, T., Tomby, R. S., & Nurmaulida, N. (2024). Project management planning of the small house construction in samarinda using the critical path method (CPM). Enrichment : Journal of Management, 14(3), 476–487. https://doi.org/10.35335/enrichment.v14i3.1939
Venn Y. I. Ilwaru, Dorteus L. Rahakbauw, J. T. (2018). Penjadwalan Waktu Proyek Pembangunan Rumah Dengan Menggunakan Cpm ( Critical Path Method ) Time Schedule Project Of Housing Development Using Cpm ( Critical Path Method ) ( Study Case: Residential Development in Amahusu Village , Ambon City ). 12, 61–68.
Wardani, N. M. E., Musdalifah, S., & Lusiyanti, D. (2018). OPTIMALISASI BIAYA DAN WAKTU PELAKSANAAN PROYEK PEMBANGUNAN PERUMAHAN CITRALAND PALU MENGGUNAKAN METODE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) – CRITICAL PATH METHOD (CPM). JURNAL ILMIAH MATEMATIKA DAN TERAPAN, 15(2), 197–208. https://doi.org/10.22487/2540766X.2018.v15.i2.11353
Zareei, S. (2018). Project scheduling for constructing biogas plant using critical path method. Renewable and Sustainable Energy Reviews, 81(August 2017), 756–759. https://doi.org/10.1016/j.rser.2017.08.025
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Nabila Ariyanur, Devi Indah Ruliyanti, Naura Luji Aqila, Dewi Anaswati, Hilwa

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.